Green Project Reserve and Additional Subsidization Project List
2020 Appropriations
Guthrie Public Works Authority |
Binding Commitment: |
$8,000,000.00 |
Green Amount: |
$52,000.00 |
Principal Forgiveness: |
$0.00 |
Project Description: |
Construction of new wastewater treatment facility |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Bartlesville Municipal Authority |
Binding Commitment: |
$8,220,000.00 |
Green Amount: |
$8,220,000.00 |
Principal Forgiveness: |
$0.00 |
Project Description: |
Wastewater reuse project |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Broken Arrow Municipal Authority |
Binding Commitment: |
$19,695,000.00 |
Green Amount: |
$2,030,000.00 |
Principal Forgiveness: |
$0.00 |
Project Description: |
Various wastewater projects and AMR's |
Green Category: |
WE, EE |
Additional Information: |
Green Documentation |
Bristow Municipal Authority |
Binding Commitment: |
$9,100,000.00 |
Green Amount: |
$1,015,250.00 |
Principal Forgiveness: |
$0.00 |
Project Description: |
WWTP & AMR |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Porter Public Works Authority |
Binding Commitment: |
$206,750.00 |
Green Amount: |
$0.00 |
Principal Forgiveness: |
$206,750.00 |
Project Description: |
P & D WWTP Improvements |
Green Category: |
N/A |
Westville Utility Authority |
Binding Commitment: |
$109,395.26 |
Green Amount: |
$0.00 |
Principal Forgiveness: |
$109,395.26 |
Project Description: |
Sewer system improvements US Hwy 62/59 |
Green Category: |
N/A |
Eufaula Public Works Authority |
Binding Commitment: |
$240,000.00 |
Green Amount: |
$0.00 |
Principal Forgiveness: |
$240,000.00 |
Project Description: |
Planning & Design WWTP |
Green Category: |
N/A |
2019 Appropriations
Broken Arrow Municipal Authority |
Binding Commitment: |
$11,415,000.00 |
Green Amount: |
$5,148,000.00 |
Principal Forgiveness: |
$0.00 |
Project Description: |
Haikey Creek WWTP Improvements |
Green Category: |
EE |
Additional Information: |
Green Documentation |
Inola Public Works Authority |
Binding Commitment: |
$2,600,000.00 |
Green Amount: |
$90,000.00 |
Principal Forgiveness: |
$200,000.00 |
Project Description: |
SW Blvd SS Project |
Green Category: |
EE |
Additional Information: |
Green Documentation |
Durant City Utilities Authority |
Binding Commitment: |
$12,935,000.00 |
Green Amount: |
$1,242,800.00 |
Principal Forgiveness: |
$0.00 |
Project Description: |
WWTF System Improvements |
Green Category: |
EE |
Additional Information: |
Green Documentation |
Shidler Public Works Authority |
Binding Commitment: |
$89,385.00 |
Green Amount: |
$89,385.00 |
Principal Forgiveness: |
$89,385.00 |
Project Description: |
AMRs |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Pawhuska Public Works Authority |
Binding Commitment: |
$190,050.00 |
Green Amount: |
$0.00 |
Principal Forgiveness: |
$190,050.00 |
Project Description: |
Lake dam rehabilitation |
Green Category: |
N/A |
Roland Utility Authority |
Binding Commitment: |
$740,000.00 |
Green Amount: |
$740,000.00 |
Principal Forgiveness: |
$0.00 |
Project Description: |
Install 1500 AMRs |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Elgin Public Works Authority |
Binding Commitment: |
$2,400,000.00 |
Green Amount: |
$1,720,000.00 |
Principal Forgiveness: |
$0.00 |
Project Description: |
WWTP Phase 2 improvements |
Green Category: |
WE, EE |
Additional Information: |
Green Documentation |
Duncan Public Utilities Authority |
Binding Commitment: |
$20,446,000.00 |
Green Amount: |
$20,400,000.00 |
Principal Forgiveness: |
$0.00 |
Project Description: |
I/I Reduction Program |
Green Category: |
EE |
Additional Information: |
Green Documentation |
Cameron Public Works Authority |
Binding Commitment: |
$43,310.00 |
Green Amount: |
$0.00 |
Principal Forgiveness: |
$43,310.00 |
Project Description: |
Repair lagoon system |
Green Category: |
N/A |
Meeker Public Works Authority |
Binding Commitment: |
$78,000.00 |
Green Amount: |
$0.00 |
Principal Forgiveness: |
$78,000.00 |
Project Description: |
Planning & Design of wastewater collection system improvements |
Green Category: |
N/A |
East Central Oklahoma Water Authority |
Binding Commitment: |
$36,130.00 |
Green Amount: |
$0.00 |
Principal Forgiveness: |
$36,130.00 |
Project Description: |
Planning & Design for sewer collection & AMR meters |
Green Category: |
N/A |
Dewar Public Works Authority |
Binding Commitment: |
$209,250.00 |
Green Amount: |
$0.00 |
Principal Forgiveness: |
$209,250.00 |
Project Description: |
Planning for WWTP upgrades |
Green Category: |
N/A |
Westville Utility Authority |
Binding Commitment: |
$37,575.00 |
Green Amount: |
$0.00 |
Principal Forgiveness: |
$37,575.00 |
Project Description: |
Planning & Design of sewer expansion |
Green Category: |
N/A |
Haileyville Public Works Authority |
Binding Commitment: |
$440,000.00 |
Green Amount: |
$377,861.00 |
Principal Forgiveness: |
$200,000.00 |
Project Description: |
AMRs and Sewer System Improvements |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Hartshorne Public Works Authority |
Binding Commitment: |
$580,000.00 |
Green Amount: |
$580,000.00 |
Principal Forgiveness: |
$0.00 |
Project Description: |
AMR Project |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Carney Public Utilities Authority |
Binding Commitment: |
$505,000.00 |
Green Amount: |
$129,332.00 |
Principal Forgiveness: |
$200,000.00 |
Project Description: |
AMR Installation and Wastewater System Improvements |
Green Category: |
WE |
Additional Information: |
Green Documentation |
2018 Appropriations
Durant City Utilities Authority |
Binding Commitment: |
$4,000,000.00 |
Green Amount: |
$4,000,000.00 |
Principal Forgiveness: |
$0.00 |
Project Description: |
AMI Project |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Shawnee Municipal Authority |
Binding Commitment: |
$5,380,000.00 |
Green Amount: |
$5,380,000.00 |
Principal Forgiveness: |
$0.00 |
Project Description: |
AMI Project |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Inola Public Works Authority |
Binding Commitment: |
$300,000.00 |
Green Amount: |
N/A |
Principal Forgiveness: |
$300,000.00 |
Project Description: |
Planning & Design |
Green Category: |
N/A |
Coalgate Public Works Authority |
Binding Commitment: |
$400,000.00 |
Green Amount: |
N/A |
Principal Forgiveness: |
$200,000.00 |
Project Description: |
Lift station and collection improvements |
Green Category: |
N/A |
Weleetka Public Works Authority |
Binding Commitment: |
$400,000.00 |
Green Amount: |
N/A |
Principal Forgiveness: |
$200,000.00 |
Project Description: |
Lift station and collection improvements |
Green Category: |
N/A |
Elk City Public Works Authority |
Binding Commitment: |
$191,000.00 |
Green Amount: |
$0.00 |
Principal Forgiveness: |
$191,000.00 |
Project Description: |
Permeable concrete pavers, planting trees, installing new green irrigation system |
Green Category: |
N/A |
Calumet Public Works Authority |
Binding Commitment: |
$1,100,000.00 |
Green Amount: |
N/A |
Principal Forgiveness: |
$200,000.00 |
Project Description: |
Wastewater system improvements |
Green Category: |
N/A |
Meeker Public Works Authority |
Binding Commitment: |
$60,000.00 |
Green Amount: |
N/A |
Principal Forgiveness: |
$60,000.00 |
Project Description: |
Engineering for a sewer system evaluation |
Green Category: |
N/A |
Carney Public Works Authority |
Binding Commitment: |
$104,850.00 |
Green Amount: |
N/A |
Principal Forgiveness: |
$104,850.00 |
Project Description: |
Planning & design |
Green Category: |
N/A |
Haileyville Public Works Authority |
Binding Commitment: |
$48,600.00 |
Green Amount: |
N/A |
Principal Forgiveness: |
$40,850.00 |
Project Description: |
Planning & design for a sewer system evaluation |
Green Category: |
N/A |
Broken Arrow Municipal Authority |
Binding Commitment: |
$4,225,000.00 |
Green Amount: |
$759,520.00 |
Principal Forgiveness: |
$0 |
Project Description: |
WWTP rehab |
Green Category: |
WE |
Additional Information: |
Green Documentation |
2017 Appropriations
Wilburton Public Works Authority |
Binding Commitment: |
$204,760.00 |
Green Amount: |
$0 |
Principal Forgiveness: |
$204,760.00 |
Project Description: |
Improvements to sewer lines and manholes |
Green Category: |
N/A |
Broken Arrow Municipal Authority |
Binding Commitment: |
$2,100,000.00 |
Green Amount: |
$2,100,000.00 |
Principal Forgiveness: |
$0 |
Project Description: |
AMR project |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Altus Municipal Authority |
Binding Commitment: |
$11,000,000.00 |
Green Amount: |
$3,464,267.48 |
Principal Forgiveness: |
$0 |
Project Description: |
AMR project |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Bixby Public Works Authority |
Binding Commitment: |
$24,000,000.00 |
Green Amount: |
$2,840,794.50 |
Principal Forgiveness: |
$0 |
Project Description: |
AMRs and a new WWTP |
Green Category: |
EE/WE |
Additional Information: |
Green Documentation |
Calumet Public Works Authority |
Binding Commitment: |
$102,500.00 |
Green Amount: |
$0 |
Principal Forgiveness: |
$102,500.00 |
Project Description: |
Planning & Design for sanitary sewer improvements |
Green Category: |
N/A |
Weleetka Public Works Authority |
Binding Commitment: |
$82,500.00 |
Green Amount: |
$0 |
Principal Forgiveness: |
$82,500.00 |
Project Description: |
Planning & Design/Sanitary Sewer Evaluation Services |
Green Category: |
N/A |
Inola Public Works Authority |
Binding Commitment: |
$161,250.00 |
Green Amount: |
$0 |
Principal Forgiveness: |
$161,250.00 |
Project Description: |
I/I study and engineering report |
Green Category: |
N/A |
Coalgate Public Works Authority |
Binding Commitment: |
$213,050.00 |
Green Amount: |
$0 |
Principal Forgiveness: |
$213,050.00 |
Project Description: |
Planning & Design/Sanitary Sewer Evaluation Services |
Green Category: |
N/A |
Porum Public Works Authority |
Binding Commitment: |
$496,117.00 |
Green Amount: |
$0 |
Principal Forgiveness: |
$307,140.00 |
Project Description: |
Remove and replace sewer lines and manholes |
Green Category: |
N/A |
2016 Appropriations
Norman Utilities Authority |
Binding Commitment: |
$304,625.00 |
Green Amount: |
$304,625.00 |
Principal Forgiveness: |
$304,625.00 |
Project Description: |
Planting/reinforcing vegetation, installing diversion logs and pervious pavement |
Green Category: |
GI |
Additional Information: |
Green Documentation |
Oklahoma Conservation Commission |
Binding Commitment: |
$300,000.00 |
Green Amount: |
$300,000.00 |
Principal Forgiveness: |
$300,000.00 |
Project Description: |
4x GPR Projects |
Green Category: |
GI |
Additional Information: |
Green Documentation |
Muskogee MA |
|
Binding Commitment: |
$110,000.00 |
Green Amount: |
$110,000.00 |
Principal Forgiveness: |
$110,000.00 |
Project Description: |
Civitan Basin Drainage Study |
Green Category: |
EI |
Additional Information: |
Green Documentation |
Lawton WA |
|
Binding Commitment: |
$200,000.00 |
Green Amount: |
$200,000.00 |
Principal Forgiveness: |
$200,000.00 |
Project Description: |
Indirect Potable Reuse Study |
Green Category: |
EI |
Additional Information: |
Green Documentation |
Porum PWA |
|
Binding Commitment: |
$780,000.00 |
Green Amount: |
$676,116.92 |
Principal Forgiveness: |
$164,875.00 |
Project Description: |
AMR Project |
Green Category: |
WE |
Additional Information: |
Green Documentation |
2015 Appropriations
Broken Arrow MA |
|
Binding Commitment: |
$2,045,000.00 |
Green Amount: |
$2,045,000.00 |
Principal Forgiveness: |
$250,000.00 |
Project Description: |
AMR Project |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Eufaula PWA |
|
Binding Commitment: |
$675,000.00 |
Green Amount: |
$675,000.00 |
Principal Forgiveness: |
$250,000.00 |
Project Description: |
AMR Project |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Perkins PWA |
|
Binding Commitment: |
$615,000.00 |
Green Amount: |
$477,366.00 |
Principal Forgiveness: |
$250,000.00 |
Project Description: |
AMR Project |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Tuttle PWA |
|
Binding Commitment: |
$329,500.00 |
Green Amount: |
$329,500.00 |
Principal Forgiveness: |
$250,000.00 |
Project Description: |
AMR Project |
Green Category: |
WE |
Additional Information: |
Green Documentation |
2014 Appropriations
Colbert PWA |
|
Binding Commitment: |
$950,000 |
Green Amount: |
$362,335.00 |
Principal Forgiveness: |
$308,221.50 (population < 3,300) |
Project Description: |
WWTP Lagoon Improvement Project |
Green Category: |
EE |
Additional Information: |
Green Documentation |
GPR Checklist |
El Reno MA |
|
Binding Commitment: |
$22,390,000 |
Green Amount: |
$1,038,000 |
Principal Forgiveness: |
$0 |
Project Description: |
WWTP Construction |
Green Category: |
EE |
Additional Information: |
Green Documentation |
Nicoma Park DA |
|
Binding Commitment: |
$4,120,000 |
Principal Forgiveness: |
$308,221.50 (population < 3,300) |
Project Description: |
Expansion of the existing sanitary sewer system to serve unsewered businesses and residents wtihin the City |
2013 Appropriations
*Based on estimates provided at the time of Board approval.
Norman PWA |
|
Binding Commitment: |
$50,300,000 |
Green Amount: |
$2,457,000 |
Principal Forgiveness: |
$0 |
Project Description: |
Water Reclaimation Facililty Improvements |
Green Category: |
EE / WE |
Additional Information: |
Green Documentation |
Locust Grove PWA |
|
Binding Commitment: |
$3,485,000 |
Green Amount: |
$0 |
Principal Forgiveness: |
$254,033.50 (population < 3,300) |
Project Description: |
WWTP Improvements |
Green Category: |
N/A |
Additional Information: |
N/A |
Frederick PWA |
|
Binding Commitment: |
$7,380,000 |
Green Amount: |
$529,000 |
Principal Forgiveness: |
$0 |
Green Project Description: |
Center Pivot Irrigation System & Sprinklers |
Green Category: |
WE |
Additional Information: |
Green Documentation |
Oilton PWA |
|
Binding Commitment: |
$2,850,000 |
Green Amount: |
$0 |
Principal Forgiveness: |
$254,033.50 (Population <3,300) |
Project Description: |
Rehabilitation of existing Lagoons & construction of new lagoon |
Green Category: |
N/A |
Additional Information: |
N/A |
2012 Appropriations
*Based on estimates provided at the time of GPR determination.
Hennessey MA |
|
Binding Commitment: |
$1,800,000 |
Green Amount: |
$350,793.45 |
Principal Forgiveness: |
$134,627.00 |
Green Project Description: |
Groundwater Recharge |
Green Category: |
EI |
Additional Information: |
Business Case |
Lone Grove W&STA |
|
Binding Commitment: |
$11,755,000 |
Green Amount: |
$3,735,535.53 |
Principal Forgiveness: |
$500,000.00 |
Green Project Description: |
Cascade Aerators, High Efficiency Pumps and Motors, Extended Aeration Activated Sludge Facility |
Green Category: |
EE |
Additional Information: |
Business Case |
2011 Appropriations
*Based on estimates provided at the time of GPR determination.
Chandler MA |
|
Binding Commitment: |
$1,300,000 |
Green Amount: |
$210,000 |
Principal Forgiveness: |
$210,000 |
Green Project Description: |
High Efficiency Pumps |
Green Category: |
EE |
Additional Information: |
Green Documentation |
Elgin PWA |
|
Binding Commitment: |
$3,150,000 |
Green Amount: |
$300,700 |
Principal Forgiveness: |
$300,700 |
Green Project Description: |
High Efficiency Pumps |
Green Category: |
EE |
Additional Information: |
Green Documentation |
Eufaula PWA |
|
Binding Commitment: |
$4,035,000 |
Green Amount: |
$439,350 |
Principal Forgiveness: |
$164,477.40 |
Green Project Description: |
Diffused Aeration and High Efficiency Pumps |
Green Category: |
EE |
Additional Information: |
Green Documentation |
Glenpool USA |
|
Binding Commitment: |
$3,740,625 |
Green Amount: |
$322,892 |
Principal Forgiveness: |
$322,892 |
Green Project Description: |
Fine Bubble Diffuser and Blower and High Efficiency Pumps |
Green Category: |
EE |
Additional Information: |
Business Case |
Owasso PWA |
|
Binding Commitment: |
$3,540,000 |
Green Amount: |
$107,434.60 |
Principal Forgiveness: |
$107,434.60 |
Green Project Description: |
Variable Frequency Drives |
Green Category: |
EE |
Additional Information: |
Green Documentation |
Tulsa MUA |
|
Binding Commitment: |
$23,480,000 |
Green Amount: |
$1,080,000 |
Principal Forgiveness: |
$0 |
Green Project Description: |
Non-potable Gray Water |
Green Category: |
WE |
Additional Information: |
Green Documentation |
2010 Appropriations
*Based on estimates provided at the time of GPR determination.
Okemah UA |
|
Total Project Cost: |
$2,565,000 |
Green Amount: |
$234,337 |
Principal Forgiveness: |
$234,337 |
Green Project Description: |
High Efficiency Pumps & Motors |
Green Category: |
EE |
Additional Information: |
Business Case |
Okmulgee MA |
|
Total Project Cost: |
$650,000 |
Green Amount: |
$650,000 |
Principal Forgiveness: |
$104,095.75 |
Green Project Description: |
High Efficiency Pumps & Motors |
Green Category: |
EE |
Additional Information: |
Business Case |
Bixby PWA |
|
Total Project Cost: |
$2,860,000 |
Green Amount: |
$676,913.50 |
Principal Forgiveness: |
$435,595.75 |
Green Project Description: |
Bio-retention Facility |
Green Category: |
GI |
Additional Information: |
Business Case |
Pawnee PWA |
|
Total Project Cost: |
$6,955,000 |
Green Amount: |
$737,500 |
Principal Forgiveness: |
$500,000 |
Green Project Description: |
High Efficiency Pumps & Motors / Water Reuse |
Green Category: |
EE/WE |
Additional Information: |
Business Case |
Fort Gibson UA |
|
Total Project Cost: |
$980,000 |
Green Amount: |
$980,000 |
Principal Forgiveness: |
$153,595.75 |
Green Project Description: |
High Efficiency Fine Bubble Aerators |
Green Category: |
EE |
Additional Information: |
Business Case |
Yale UA |
|
Total Project Cost: |
$2,990,000 |
Green Amount: |
$233,000 |
Principal Forgiveness: |
$233,000 |
Green Project Description: |
High Efficiency Pumps and Motors |
Green Category: |
EE |
Additional Information: |
Business Case |
Inola PWA |
|
Total Project Cost: |
$2,000,000 |
Green Amount: |
$680,600 |
Principal Forgiveness: |
$306,595.75 |
Green Project Description: |
Design Modification to Save Energy Costs |
Green Category: |
EE |
Additional Information: |
Business Case |
Muldrow PWA |
|
Total Project Cost: |
$3,705,000 |
Green Amount: |
$498,115 |
Principal Forgiveness: |
$498,115 |
Green Project Description: |
High efficiency pumps, motors and aerators |
Green Category: |
EE |
Additional Information: |
Business Case |
|