Oklahoma Water Resources Board the Water Agency
skip nav rules forms FAQs reports board meetings OCWP about us news
site map help
home
water quality
water supply & availability
water & wastewater financing
technical studies
· groundwater
· surface water
· water quality
· legislative
reports
hazard mitigation
data & maps


Oklahoma Comprehensive Water Plan


 

Tenkiller Wholesale Water Treatment
& Conveyance System
Phase III
Additional Preliminary Designs

January 2001

Prepared by
U.S. Army Corps of Engineers
For the Tenkiller Utilities Authority
Through the Oklahoma Water Resources Board
 

Introduction

This Phase III report presents conceptual designs and cost estimates for a regional wholesale water treatment and conveyance system serving Lake Tenkiller area. Phase III extends the system designed in Phase II to the eastern reaches of Sequoyah County. Three alternatives were developed in sufficient detail to arrive at a wholesale treated water cost per thousand gallons. Treatment plant capacities, conveyance line sizes, pumping station capacities, water tower sizes, and estimated construction costs were developed for each alternative. Gross appraisals of necessary real estate to be obtained were also determined for each alternative. In addition, possible environmental concerns that could impact construction of the alternatives were addressed.


Many documents available on this site are in Adobe® Acrobat (.PDF) format and require the free Adobe® Reader software to view and print.
Visit www.ok.gov, the Oklahoma State Portal
SoonerSearch is a service of the Oklahoma Department of Libraries and OK.GOV
©1998-2014, Oklahoma Water Resources Board
Page last updated: December 03, 2013

IMPORTANT NOTE:
This site has been redesigned using Cascading Style Sheets (CSS). If you are seeing this message you are using an older browser which lacks support for CSS. Please upgrade your browser to the latest version of Internet Explorer, Netscape or other CSS compatible browser to view this page properly.