Figure 4-6: Elevation in AO Zone (2)
Figure 4-6. The illustration above shows two feet of fill being added to the highest adjacent grade at a proposed building site to allow the structure to meet elevation requirements for a structure in Zone AO, Depth 2.

Disclaimer
©1998-2018, Oklahoma Water Resources Board